Surge V3.6 Framework — Execution Flow

The Surge Implementation Sequence

Purpose This artifact exists to show the execution sequence from intelligence gathering through measurement — so practitioners know what phase they're in, what outputs are required, and when to advance.
Document Type Flow Diagram
Framework Version 3.6 Beta
Architect Daryl Osborne
Documentation Lead Russell Wright
Execution Rule
Do not advance phases without completing the minimum outputs for the current phase. Each phase has a QA gate. Skipping gates creates compounding errors downstream.
INTELLIGENCE Analysis & Baseline Days 1-2
0
Dual-GPT Intelligence Analysis
Establish analytical baseline. Run visibility audit. Produce ranked backlog.
Baseline Scorecard Dataset Coverage Score Trust Neighborhood Targets Pilot Selection
Gate: Query set (15-30) saved. Baseline screenshots captured. Variance scores calculated.
0.5
Entity Recognition Pre-Check
Baseline entity recognition and corroboration status. Replace vague "confidence" with measurable inventory.
Entity Fact Sheet Validator Priority List Corroboration Inventory Baseline Screenshots
Gate: Entity Fact Sheet locked and approved. Contradictions flagged. Priority validators identified.
FOUNDATION Setup & Strategy Days 3-5
1
Foundation & Intake
Clean foundation for scale. Tracking, UTM conventions, canonical facts locked.
GA4 Configured GSC Connected Call Tracking Active UTM Convention Set
Gate: No publishing until Entity Fact Sheet locked. No scale until tracking verified.
2
Content Strategy & Dataset Classification
Turn services and locations into intent packs. Assign dataset mix. Define Asset Pack templates.
Intent Map Dataset Mix per Pack Asset Pack Templates
Gate: Intent map covers top services × primary geos × intent modifiers. Asset Pack template complete.
2.5
Topic Fortress Strategy OPTIONAL
Deep topical authority through pillar/cluster architecture. Activate only when core phases produce results.
Pillar Pages Cluster Content Internal Link Architecture
DEPLOYMENT Content & Node Creation Weeks 2-4
3
Primary Node Deployment
Deploy Asset Pack on controlled properties. Website, GBP, primary social/video.
Primary Page Published GBP Post Live Short Video Created Audio Asset Created
Gate: All AI drafts verified against Entity Fact Sheet. Titles match intent phrase across assets.
4
Schema & Structured Data
Page-level structured data aligned to visible content. Compliance-first.
Organization/LocalBusiness Schema WebPage/Article Schema VideoObject/AudioObject
Gate: Schema represents visible content only. No invented reviews, pricing, credentials.
5
Secondary Node Deployment
Create corroboration and distribution nodes. Extend reach and validation.
2+ Secondary Platforms Backlinks to Primary Consistent NAP
Gate: Each secondary node links to canonical primary. Brand facts match Entity Fact Sheet.
DISTRIBUTION Trust Targeting & Amplification Weeks 3-5
6
Distribution & Syndication
Trust Neighborhood Targeting. Prioritize by trust distance (S1 → S2 → S3+).
Trust Neighborhood Map Distribution Plan per Pack Wave Schedule
Gate: Vertical seeds (S0) identified. S1 hubs mapped. Distribution prioritized by trust tier.
6+
Satellite Network Architecture OPTIONAL
Advanced syndication network for highly competitive niches. Beyond standard secondary nodes.
Extended Network Competitive Displacement
7
Tertiary Node Activation
Lightweight automation and additional nodes. RSS feeds, distribution loops.
RSS Feeds Automation Loops Lightweight Aggregators
Gate: Tertiary nodes point to primary pages and approved secondary nodes only. No unreviewed content.
8
Automation & Recursion
Turn manual execution into repeatable, QA-gated systems.
Automation Flows Version Control Change Logs
Gate: Every automation includes human QA gate before publishing. One flow = one responsibility.
9
Geographic Strategy
Expand coverage deliberately based on core geo strength.
Geo Expansion Plan Duplicated Asset Packs Local Validators
Gate: Only expand when core intent packs reach Visibility Level 2+ and leads rising.
MEASUREMENT Proof & Optimization Ongoing
10
Measurement & Optimization
Prove progress, find bottlenecks, decide what to scale next.
Weekly Scorecard Update Call/Form Attribution Monthly Comparison Scale Decision
Gate: Re-run Phase 0 query set monthly. Compare against baseline. Decide next scale based on results, not opinions.
10.5
Behavioral Health Check OPTIONAL
Validate user satisfaction signals. Confirm intent match and engagement quality.
Engagement Time Check CTR Trend Analysis Return-to-SERP Proxy

Quick Reference: Phase Timeline

Phase Name Primary Focus Timeline
0 Dual-GPT Intelligence Baseline scorecard, variance scoring, target selection Day 1
0.5 Entity Recognition Pre-Check Fact sheet, corroboration inventory, validator list Days 1-2
1 Foundation & Intake Tracking, UTM, canonical facts locked Days 1-2
2 Content Strategy Intent map, dataset classification, asset pack templates Days 3-5
3 Primary Node Deployment Website, GBP, video, audio on controlled properties Days 6-12
4 Schema & Structured Data Page-level structured data, compliance-first Days 10-14
5 Secondary Node Deployment Syndicated corroboration nodes Week 3
6 Distribution & Syndication Trust Neighborhood targeting, wave scheduling Week 3-4
7 Tertiary Node Activation Automation, feeds, lightweight amplifiers Week 4
8 Automation & Recursion Repeatable content-to-distribution loops Week 5
9 Geographic Strategy Local SEO, geo expansion based on strength Week 5-6
10 Measurement & Optimization KPIs, tracking, iteration, scale decisions Ongoing